0086-13780636866 / 0086-17806251160      lisa@qdxgz.cn      0086-13780636866
|
|
|
|
|
|
|
|
|
Products Details
Home / Products / Multifunctional Steel Structure Building / Office Building / Economical Solution Prefabricated Steel Structure Office Building

Product Category

Keep In Touch With Us

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Economical Solution Prefabricated Steel Structure Office Building

Qingdao new Guangzheng steel structure engineering, such as factories, factories, warehouses, buildings, stadiums, aircraft hangars, etc., can be customized.
Availability:
Quantity:
Economical Solution Prefabricated Steel Structure Office Building
Economical Solution Prefabricated Steel Structure Office Building

Economical Solution Prefabricated Steel Structure Office Building

Product description:

Thesteel structure buildinghas high fire resistance and corrosion resistance.Steel structureis usually composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plates; the components or components are connected by welding, bolts or rivets. Some steel structures are also made of steel hinge wire, steel wire rope or steel wire bundle, cast steel and other materials.

Product advantage:

Steel structure construction has the advantages of high strength, light weight, good seismic performance, foundation cost province, large building area, high building quality, suitable for industrialization and standardized production, not affected by the construction season, low comprehensive cost, known as the representative of green building. The steel structure construction can be used for large-scale sports venues, theaters, airports, railway stations and other urban public steel structure construction, can also be factories, factories, office buildings and other private steel structure buildings.


Main structure

prefabricated steel workshop warehouse

Purlin

C Section Channel or Z Section Channel

Roof Cladding

Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil

Wall Cladding

Sandwich Panel or Corrugated Steel Sheet

Tie Rod

Circular Steel Tube

Brace

Round Bar

Column & Transverse Brace

Angle Steel or H Section Steel or Steel Pipe

Knee Brace

Angle Steel

Roof Gutter

Color Steel Sheet

Rainspout

PVC Pipe

Door

Sliding Sandwich Panel Door or Metal Door

Windows

PVC/Plastic Steel/Aluminum Alloy Window

Connecting

High Strength Bolts

Packing

Decided by you , loaded into 1X 40ft GP,1X20 ft GP,1X40 ft HQ

Drawing

We can make the design and quotation according to your require or your drawing


图片5图片6

About the price

Maybe you know that our price is slightly higher than that of other manufacturers, that is because our factory uses different kinds and grades of raw materials, processing technology and pre-treatment is different, the content of zinc layer is different, the thickness of galvanized steel raw materials is different, the quality of surface spraying powder is different, and there is the price difference of original powder, recycled powder and indoor powder. You can come to the company to do a comprehensive examination and understanding of the specific situation, and then compare with other manufacturers, you on our quality requirements and understanding of pre-sale, sale, after-sales management, finally can solve practical problems for customers, let you rest assured in the cooperation, no worries.

Maybe you know that our price is higher than the local dealers' price, that is because your quantity is small, small amount of start-up production cost is high, and the dealer is a one-time in the factory ordered tens of thousands of square meters to sell, so in the case of a small number of our price will be higher than the local dealers.

About payment

When you buy Xinguangzheng products, you pay 30% deposit in advance, and pay the remaining 70% of the payment before delivery, which is to support our work. Your timely payment saves financial cost for us, which is also the reason why we always keep high quality and low price. With your participation, let's save money together!

About the delivery time

The specific production cycle will increase or decrease with the number of goods, the starting time should be determined according to your quantity and style, here to remind you that the transportation time is an uncertain factor, especially when the delivery of less than half load, you should leave enough time.

About packing

Packaging can be carried out according to customer requirements, generally we are playing a pallet.

About transportation

1. In the actual transportation process, the company can not unify the freight because of the distance problem, so all our products are factory prices, and you bear the corresponding long distance freight after the product leaves the factory.

2, about the time on the way, we are difficult to determine, it is subject to the road distance, road patency and the driver's personal condition, all these we are not controllable, so you should leave enough time on the way before ordering, we give the time for reference only.

3. We work in the global market, and the goods in many places cannot be directly delivered, so the transit is required several times. In the past cases, the goods were lost or damaged, so you must inspect the goods first and then pay the freight. I also remind you to pay attention to collecting evidence.

4. If transported by us, we suggest that you'd better insure the price and buy transportation insurance, so that if there is an accident, the claim will be easier.

5, the price of freight is no standard, we will choose a moderate price and relatively good service transportation point after the factory comparison, in the freight calculation sometimes by weight, sometimes volume, the final price is determined by the number of vehicles on the day, the car will be cheap, the car is less expensive.

About signing

Our products are shipped after careful inspection, with delivery list, please the buyer pick up the best face to face according to the delivery list inspection, in order to protect your rights and interests, please check carefully before signing, inspection of goods found that the number of wrong or product model is wrong, please contact us in time within three days. If there is any damage in transit, please claim directly from the shipping company.

About color difference

Product pictures are real photos, but due to the impact of photography technology, light, display parameters and other factors, the received color of the real and the photo will be different, please refer to the real.

On price changes

Under normal circumstances, the price difference of raw materials does not exceed 1,000 yuan per ton. If it exceeds this standard, the company will notify the cooperative units at all levels 15 days in advance.


Previous: 
Next: 
Qingdao Xinguangzheng Husbandry Co., Ltd. is a subsidiary of Qingdao Xinguangzheng Group.

CONTACT US

 /     Lisa Jing
  lisa@qdxgz.cn
 /   0086-13780636866 / 0086-17806251160
  2016256937
  0086-13780636866
  No. 268 Shenzhen Road, Pingdu, Qingdao, China
​Copyright © 2022 Qingdao Xinguangzheng Husbandry Co., Ltd. All rights reserved   Support by Leadong  Sitemap