Product description of steel structure office building:
High-quality substrates
The Prefabricated Steel Structure Office Building believes that the improvement of the pre-treatment process and the pre-treatment liquid, with a small number of equipment and low cost, has become the mainstream process, and the stability, corrosion resistance and environmental protection performance of the pre-treatment liquid have been improved from time to time. Pay attention to the development of new coatings, stop improving ordinary polyester, polyvinylidene fluoride (PVDF) and plastic sol to obtain color reproducibility, anti-ultraviolet, anti-sulfur dioxide, improved corrosion resistance, develop pollution-resistant, heat-absorbing and other functional coatings.
The Prefabricated Steel Structure Office Building advocates more perfect unit equipment. Such as the use of a new type of welding machine, a new type of roll coating machine, the improvement of curing furnace, the configuration of advanced automatic instruments and so on. Because the cost of cold embossing is lower than that of hot embossing, and it has the characteristics of beauty, plane feeling and high strength, cold embossing pipe shed support needs to use a variety of mechanical equipment.
Advantages of steel structure office building:
1. The steel structure office building has a light weight and a small footprint, which is very convenient for transportation and installation;
2. The steel structure is extremely strong and durable, with a service life of up to 50 years;
3. The steel structure office building is highly earthquake resistant and can effectively protect the safety of people and property;
4. The steel structure has excellent fire resistance and can effectively prevent the spread of fire;
5. The steel structure office building is easy to maintain and clean, and can keep the indoor environment fresh and comfortable;
Design Parameter | |
Life Span | 50 years |
Safety Classes of Structure | Level 2 |
Seismic Fortification Intensity | 7 Degree |
Fire Resistance Rating | Level 2 |
Workshop Building Details | |
Main Steel Structure Part | H section Steel Column, Beam and Mezzanine Beam, which are treated oxide primier and grey facing painting |
Secondary Steel Structure | C section steel as Roof and Wall Purlin, galvanized surface |
Support Part | Included Tie bar, Roof and Wall Support, Bracing, Sleeve Pipe, Angle Steel |
Roof Cladding | 0.6mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet |
Wall Cladding | 0.7mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet |
Mezzanine System | Steel Frame+Decking Floor Sheet |
Window | Aluminium-alloy Window |
Brick Wall | 1.2m Height |
Our Company
FAQ:
Q1. You are manufacture factory or trading company? A: We are manufacture factory. And you are welcomed to visit us for inspection. The quality control flow will show you our professional. Also you will enjoy the best quality and competitive price. |
Q2. Is your price competitive with other companies? A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost. |
Q3. Do you offer service for installation? A: We will give detailed installation drawings and video for free.We have a professional construction team that can provide installation and installation abroad. And if you need, we could send engineers as installation director even a team. |
Q4. Do you accept container loading inspection? A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time. |
Q5. Do you offer designing service for us? A:Yes, Our design team is made up of engineers with rich design experience.We could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S,Tarch, Tekla Structures , etc. we will be glad to establish sincere business cooperation with you in the near future. |
Q6. What is the delivery time? A: Delivery time depends on order quantities. Generally, the delivery time will be 45 days after receiving deposit. |
Q7. How can you get a quotation for your projects? A: You can chat with me anytime via Trade Manager to offer me your detail information or you can just fill out our design survey (through my email below)and send back to us. We will give you the best quotation ASAP. Thanks for your kind cooperation. |