Prefabricated Steel Structure Exhibition Hall Showroom
Light prefabricated steel structure building for workshop details:
Design Parameter | |
Life Span | 50 years |
Safety Classes of Structure | Level 2 |
Seismic Fortification Intensity | 7 Degree |
Fire Resistance Rating | Level 2 |
Steel Structure Exhibition Hall Workshop Building Details | |
Main Steel Structure Part | H section Steel Column, Beam and Mezzanine Beam, which are treated oxide primier and grey facing painting |
Secondary Steel Structure | C section steel as Roof and Wall Purlin, galvanized surface |
Support Part | Included Tie bar, Roof and Wall Support, Bracing, Sleeve Pipe, Angle Steel |
Roof Cladding | 0.6mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet |
Wall Cladding | 0.7mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet |
Mezzanine System | Steel Frame+Decking Floor Sheet |
Window | Aluminium-alloy Window |
Brick Wall | 1.2m Height |
Steel structure exhibition hall has the following features:
1, steel structure, although larger, compared with other building materials, its intensity is much higher, so when under load and conditions at the same time, the light steel structure than in other institutions, easy to transport and install, and can cross a larger span.
2, good plasticity and toughness of steelPlasticity is good, make steel structure generally won't suddenly due to accidental overload or partial overload fracture damage. Good toughness, good adaptability to steel structure for dynamic loading. The performance of steel structure steel provides sufficient to ensure safe and reliable.
3, steel is closer to the uniformity and the peerSteel internal organization is evener, very close to the homogeneous isotropic body, within a certain amount of stress amplitude is almost perfectly elastic. These assumptions in the calculation of the match performance and mechanics, so the stress of the steel structure calculation results accord with the actual situation.
4, steel structure manufacture simple, easy to use in industrial production, installation period is shortSteel structure is composed of various materials, easy to make. Large steel structure are specialized in metal structure manufacturing factory in manufacturing; High precision. Made of a component to the assembled, USES the bolt links, and light structure, therefore, convenient construction, short construction period. In addition, has built steel structure is easy to remove, reinforcement or modification.
5, steel structure, good sealing, the steel structure has good air tightness and water tightness.So steel structure, the exhibition hall, already beautiful, and durable.
| |
FAQ
1. Why choose us?
We are a steel structural building Manufacturer located in Qingdao, China, We have gained a good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business is based on the quality control, price, packing, delivery time etc.
2. Does your company is a factory or trade company?
We are a factory, so you will get the best and competitive price. Our factory covers an area of 150, 000 square meters. If it is available, you might as well visit us.
3. What's the quality assurance you provided and how do you control quality?
Established a procedure to check products at all stages of the manufacturing process - from raw materials, processing, testing or inspection, to finished goods, etc.
4. What's the delivery time?
After we got you deposit, we can deliver goods within 30 days.
5. Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirements. The software we used here are Auto CAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures(Xsteel)V12.0. etc.
6. Do you offer guiding installation on site overseas?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineers to supervise installation on site overseas. Besides, we also have our own abroad guiding installation team consisting of more than 30 people.
They have finished many cases successfully in many countries, such as Iraq, Dubai, South Africa, Algeria, Ghana, Gabon, Tajikistan, Burkina Faso, Panama, Australia and so on.